News 2021
![Allt Ddu slate wilbur xmas 2.jpg](https://static.wixstatic.com/media/d6406a_df788a4c7efc4f05b2b076881139e6e4~mv2.jpg/v1/crop/x_0,y_86,w_4000,h_2419/fill/w_112,h_67,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Allt%20Ddu%20slate%20wilbur%20xmas%202.jpg)
MERRY CHRISTMAS & HAPPY NEW YEAR
ANGLESEY
December 2021
​
Our office is closed from 23rd December to 4th January. Hoping you all have a good festive season.
![Tan Y Mynydd collage Evergreen Architects](https://static.wixstatic.com/media/d6406a_de636e7105a245039588fe80c40762f1~mv2.jpg/v1/crop/x_0,y_59,w_2880,h_1742/fill/w_112,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Tan%20Y%20Mynydd%20collage%20Evergreen%20Architects.jpg)
PLANNING APPROVAL
NORTH WALES
December 2021
​
Tan Y Mynydd, Conwy, is a boutique manufacturing factory for well-being products, that has just been granted planning permission. Now there's a nice Christmas present!
![Seintwar construction photo Evergreen Architects.jpg](https://static.wixstatic.com/media/d6406a_4c9121c275b44bed8e44f9f37ea066b4~mv2.jpg/v1/crop/x_4,y_0,w_1729,h_1046/fill/w_112,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Seintwar%20construction%20photo%20Evergreen%20Architects.jpg)
CONSTRUCTION
ANGLESEY
December 2021
​
The beautiful stone wall is now complete at Seintwar. Just a some timber cladding to complete the front elevation.
![Cae Wllf timber frame extension Evergreen Architects sketch.JPG](https://static.wixstatic.com/media/d6406a_bb3c827ab3ed48e988b88935e9d42b9c~mv2.jpg/v1/crop/x_0,y_171,w_2880,h_1742/fill/w_112,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Cae%20Wllf%20timber%20frame%20extension%20Evergreen%20Architects%20sketch_JPG.jpg)
TIMBER FRAME SIPS
BALA
December 2021
​
We are working with Welsh sawmill, Arfon Timber, who will provide Structurally Insulated Panels (SIPs), built in their workshop and assembled on site at Cae Wllf.
![Liverpool lights](https://static.wixstatic.com/media/d6406a_adae2c5bfe06492e8fd88393b340f9aa~mv2.jpg/v1/crop/x_0,y_361,w_3807,h_2303/fill/w_112,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/20211028_185726.jpg)
RIVER OF LIGHT
LIVERPOOL
November 2021
​
We loved visiting the River of Light festival in Liverpool.
![Seintwar timber cladding](https://static.wixstatic.com/media/d6406a_00b974a795e146d5af4a50a79413105d~mv2.jpg/v1/fill/w_38,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/IMG-20211118-WA0000.jpg)
LARCH CLADDING
ANGLESEY
November 2021
​
The external envelope is almost complete for our new build modular timber frame house Seintwar. The beautiful larch cladding will silver over time.
![Pool shell](https://static.wixstatic.com/media/d6406a_9189e558c9064ca99b8b67dc9ca2edc0~mv2.jpg/v1/crop/x_0,y_311,w_832,h_503/fill/w_112,h_67,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/maes%20y%20porth.jpg)
SWIMMING POOL SHELL
ANGLESEY
November 2021
​
The concrete pool shell has been poured at Maes Y Porth. This project will be undertaken in two phases. The first is to create an outdoor pool and in a few years the second will be to enclose it, so it can be swam in all year round.
![Gorffwysfa Section Evergreen Architects.jpg](https://static.wixstatic.com/media/d6406a_78cf5be153464d2d972d5be6c34afc4c~mv2.jpg/v1/crop/x_0,y_74,w_4594,h_2776/fill/w_112,h_67,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Gorffwysfa%20Section%20Evergreen%20Architects.jpg)
BUILDING REGULATIONS
LLANDDONA
November 2021
​
Two storey extension to Gorffwysfa house, with Juliet balcony to take in views over Llanddona beach. A building contractor has been appointed and construction should begin shortly.
![Timber frame factory](https://static.wixstatic.com/media/d6406a_1d68dba4cd3342d788a096d1360538ef~mv2.jpg/v1/fill/w_111,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/lowfield.jpg)
MODERN METHODS OF CONSTRUCTION
WELSHPOOL
October 2021
​
Wood Knowledge Wales organised a tour of Lowfield and PYC factories. It was great to better understand their processes and how they deliver housing projects.
![Chris Passive house Designer](https://static.wixstatic.com/media/d6406a_42eea395dcf54e009d0b773087a9c712~mv2.jpg/v1/crop/x_0,y_56,w_1553,h_939/fill/w_112,h_67,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/chrisPHPPdesignerwider2.jpg)
CERTIFIED PASSIVE HOUSE DESIGNER
CERTIFIED
November 2021
​
We are really excited to share that Chris is now a Certified Passive House Designer. We can now offer this service for any of our design projects.
![9 The Green](https://static.wixstatic.com/media/d6406a_84ca6fc642e14e8cad24bbb1b7ec7e6a~mv2.jpg/v1/crop/x_134,y_0,w_3571,h_2160/fill/w_112,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/9%20The%20Green.jpg)
PLANNING SUBMISSION
ELLESMERE PORT
October 2021
​
This extension to The Green is a modular timber frame building that will be craned to site almost complete. Just the external finishes left to do.
![Pentrans front elevation](https://static.wixstatic.com/media/d6406a_d84728baf2224538bb2ed059070d1dbe~mv2.jpg/v1/fill/w_97,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Pentrans%20front%20elevation.jpg)
CONSTRUCTION PROGRESS
![Tyn Y Caeau construction aerial.jpg](https://static.wixstatic.com/media/d6406a_b3c648b48af14b37a88ecfc93acd873d~mv2.jpg/v1/fill/w_90,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Tyn%20Y%20Caeau%20construction%20aerial.jpg)
CONSTRUCTION NEARS COMPLETION
![Jonathan Conservation](https://static.wixstatic.com/media/d6406a_87459b9e8d3d4622a0acf3f966cb0680~mv2.jpg/v1/crop/x_0,y_0,w_1240,h_750/fill/w_112,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/jonConservation.jpg)
CONSERVATION
ANGLESEY
October 2021
​
Designing in Anglesey and North Wales, a lot of our projects are in Areas of Outstanding Beauty and Conservation Areas and some buildings are Listed. Over the past few weeks Jonathan caught up on the latest legislation on the excellent RIBA Conservative course.
![Nyth pren construction.jpeg](https://static.wixstatic.com/media/d6406a_1eeb7aa96e504eff9deefba16dde290f~mv2.jpeg/v1/fill/w_90,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Nyth%20pren%20construction.jpeg)
STRAW BALE CONSTRUCTION
ANGLESEY
November 2021
​
Aiming to be water tight before winter sets in at Nyth Pren. Funny thing is that if the straw bales are not sheathed fairly promptly and get wet, they will start to sprout new growth!
![DSCF3712.jpg](https://static.wixstatic.com/media/d6406a_2d5c42ebf3d14737b5b964d42f4a6cdc~mv2.jpg/v1/crop/x_0,y_0,w_1240,h_750/fill/w_112,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/jonPD.jpg)
PRINCIPAL DESIGNER
CPD TRAINING
September 2021
​
You may not know... but all construction projects requiring more than one contractor must appoint a Principal Designer. A Principal Designer risk assesses the health and safety of everyone affected by the construction of a new building project, typically until the Principal Contractor takes on the project. Jonathan recently completed the RIBA training course and can to offer this service to all our clients.
![Tan Y Mynydd balcony sketch](https://static.wixstatic.com/media/d6406a_334b9b08826849f4bd8e6b5fcdf8205a~mv2.png/v1/crop/x_0,y_59,w_2880,h_1742/fill/w_62,h_38,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/Tan%20Y%20Mynydd%20balcony%20sketch_PNG.png)
PLANNING SUBMISSION
NORTH WALES
October 2021
​
Tan Y Mynydd, Conwy, is a boutique manufacturing factory for well-being products. We have added additional structure to the existing building and extended the footprint to include an office, staff facilities and conference room.
![DSCF3712.jpg](https://static.wixstatic.com/media/d6406a_9c59fa46d16e4c8185ce1b42a4ff116c~mv2.jpg/v1/fill/w_90,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/IMG_20210905_135142.jpg)
ENGINEERED TIMBER I-JOISTS ROOF CONSTRUCTION
ANGLESEY
September 2021
​
The roof structure is now being installed at our new build house Nyth Pren. The house will soon be water-tight in time for the coming winter months.
![20211008_122730.jpg](https://static.wixstatic.com/media/d6406a_b860edafb011482797feb8ae1636f58f~mv2.jpg/v1/fill/w_90,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/20211008_122730.jpg)
CONSTRUCTION PROGRESS
PENMON
October 2021
​
Construction is progressing well at Penlon. The views from this house are stunning.
![Hen ddinas rear elevation night](https://static.wixstatic.com/media/d6406a_ab50e64aea844aabb168a95226203442~mv2.jpg/v1/crop/x_134,y_0,w_3571,h_2160/fill/w_112,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Hen%20ddinas%20rear%20elevation%20night.jpg)
PLANNING SUBMISSION
GWYNEDD
October 2021
​
A timber frame two storey extension to this beautiful traditional stone house, Hen Ddinas, Caernarfon.
![Stanton extension photo](https://static.wixstatic.com/media/d6406a_3e9c17ec852d4534837f07e61a0ed83e~mv2.png/v1/fill/w_56,h_38,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/Screenshot%202021-08-26%20at%2016_53_16.png)
STANTON HOUSE EXTENSION & RENOVATION COMPLETE
ANGLESEY
September 2021
​
The extension and renovation at house Stanton in Beaumaris is complete. Additional photos are available on the project page.
![Yr Hen Weithdy morning mist.jpg](https://static.wixstatic.com/media/d6406a_3f230512cd534ae7bcbdc80fed7659b7~mv2.jpg/v1/crop/x_134,y_0,w_3571,h_2160/fill/w_112,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Yr%20Hen%20Weithdy%20morning%20mist.jpg)
PLANNING SUBMISSION
GWYNEDD
October 2021
​
A modular off-site timber frame two storey new build house, Yr Hen Weithdy, Clwt Y Bont.
![DSCF3712.jpg](https://static.wixstatic.com/media/d6406a_8a2c9f29afc540b09076756af5ed827e~mv2.png/v1/fill/w_62,h_35,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/Image15.png)
PLANNING APPROVAL
RUTHIN, NORTH WALES
September 2021
​
Great to get the green light on this extensive remodel at Tan Yr Esgair. The client has some excellent environmental aspirations for the retrofit elements. More details to follow....
![Stretton above visualisation](https://static.wixstatic.com/media/d6406a_4d7eefae23444f899b20a404f3ff778e~mv2.jpg/v1/fill/w_112,h_61,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Stretton%20above.jpg)
ROOF TERRACE SINGLE STOREY EXTENSION
ANGLESEY
August 2021
​
We are currently doing technical drawings for Building Regulations for this single storey extension. The building is angled towards the evening sun. The terrace roof is the perfect place to chill at the end of a long day.
![Frondeg window.jpg](https://static.wixstatic.com/media/d6406a_c6fb0a60d9664038aa0000c8f6c5891a~mv2.jpg/v1/fill/w_112,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Frondeg%20window.jpg)
FRONDEG UCHAF HOUSE EXTENSION & RENOVATION NEARS COMPLETION
ANGLESEY
September 2021
​
The extension and renovation at house Frondeg Uchaf in Llanberis is a few weeks from completion. The juxtaposition of the old cold stonework and the new warm timber is stunning.
![Nyth Pren straw bale construction photo](https://static.wixstatic.com/media/d6406a_eac3c94063d942ec8d316236d6cd5595~mv2.jpg/v1/fill/w_90,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Nythpren%20build.jpg)
STRAW BALE MODULAR CONSTRUCTION
ANGLESEY
August 2021
​
The Ecococon straw bale panels are installed at our new build house Nyth Pren and the roof installation is about to start.
![Seintwar modular timber frame above photo](https://static.wixstatic.com/media/d6406a_436e63810b064be08d0c9f83255d4c95~mv2.jpg/v1/fill/w_90,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Seintwar%20drone.jpg)
TIMBER FRAME MODULAR CONSTRUCTION
ANGLESEY
August 2021
​
The timber frame is almost complete for our new build house Seintwar and the slates are starting to go on the roof.
![Plas Bodafon sketch.JPG](https://static.wixstatic.com/media/d6406a_31f0b706b4714cee9dcd52217b587eb4~mv2.jpg/v1/crop/x_0,y_208,w_3073,h_1861/fill/w_111,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Plas%20Bodafon%20sketch_JPG.jpg)
PLANNING APPROVAL
ANGLESEY
September 2021
​
Single storey garden room extension Plas Bodafon house has been given planning approval. We will begin technical drawings for Building Regulations shortly.
![A day at evergreen architects](https://static.wixstatic.com/media/d6406a_43af2a620dc94d549e49a7571fb97eda~mv2.jpg/v1/fill/w_112,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Site%20visit.jpg)
FRIDAY FUN
ANGLESEY
August 2021
​
It was fab to have my son visit us at the end of a working day for a surf in the sea.
![Ty Du extension construction photo](https://static.wixstatic.com/media/d6406a_df327e24dda44640b86bb1d4fcaaf6ee~mv2.jpg/v1/fill/w_112,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Ty%20Du%20construction.jpg)
CONSTRUCTION AT TY DU
ANGLESEY
August 2021
​
The external envelope is almost complete at Ty Du for the new extension. We love the little black steel link that defines the meeting of the old and new house.
![Mountain road garage office](https://static.wixstatic.com/media/d6406a_ed9f8c360a7e4b1982651ef59e0a6ec9~mv2.jpg/v1/fill/w_112,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Image4blur.jpg)
BUILDING REGULATIONS
ANGLESEY
July 2021
​
Building regulation drawings prepared for timber clad garden office / garage, on sloped site on Mountain Road. Off to Structural Engineers for their structural design and specification.
![Social mobility foundation evergreen architects mentor](https://static.wixstatic.com/media/d6406a_9eb7469aa2014fd289eaac3fd665060e~mv2.jpg/v1/fill/w_68,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/SMF2.jpg)
SOCIAL MOBILITY FOUNDATION
ANGLESEY
July 2021
​
We are excited to be mentors with the Social Mobility Foundation, which gives sixth form students from disadvantaged backgrounds the opportunity to connect with businesses as they prepare for University.
![Plas Bodafon steel and glass extension](https://static.wixstatic.com/media/d6406a_83c2f821ccad4d33a43461ac0faddc16~mv2.jpg/v1/fill/w_112,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/South%20West%20Elevation.jpg)
PLANNING SUBMISSION
ANGLESEY
July 2021
​
Single storey garden room extension Plas Bodafon house submitted for planning approval.
![Ty Celyn extension construction photo](https://static.wixstatic.com/media/d6406a_32395c74a79644dd93ca31ca5401ea74~mv2.jpg/v1/fill/w_90,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/9215c7be-24dd-4c1d-ae3a-4af225630451.jpg)
STEELWORK AT TY CELYN
![Seintwar timber frame sketch evergreen architects](https://static.wixstatic.com/media/d6406a_bd33ec24d2954ef38e0244038531c7a5~mv2.jpg/v1/fill/w_105,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Seintwar%20timber%20frame_JPG.jpg)
MODULAR TIMBER FRAME
![Min Y Mor sketch menai bridge](https://static.wixstatic.com/media/d6406a_f03f6fb230f34cb699b37e85b595958c~mv2.jpg/v1/fill/w_105,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Min%20Y%20Mor%20sketch_JPG.jpg)
BUILDING REGULATIONS
Menai Bridge
July 2021
​
We have now sent our technical drawings for Min Y Mor beach house to the Structural Engineer for their specification and calculations.
![Min Y Mor visualisation](https://static.wixstatic.com/media/d6406a_a1e723a71ddc4cb990e3e4db540ab81b~mv2.jpg/v1/fill/w_112,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Min%20Y%20Mor%20low.jpg)
PLANNING APPROVED
MENAI BRIDGE
June 2021
​
Two storey extension and renovation to Min Y Mor beach house, to maximise views over the Menai Strait and increase the number of bedrooms. We are now preparing drawings for Building Regulations.
![Gorffwysfa extension sketch](https://static.wixstatic.com/media/d6406a_1d291113c8714356b38a3cfbc88b7b41~mv2.jpg/v1/fill/w_105,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Gorffwysfa_JPG.jpg)
PLANNING APPROVED
LLANDDONA
June 2021
​
Two storey extension to Gorffwysfa house, to maximise views over Llanddona beach. We are now preparing drawings for Building Regulations.
![Crich 2 storey extension aerial graphic](https://static.wixstatic.com/media/d6406a_0b39ed48f2504e7c87e55fdf8521fcec~mv2.jpg/v1/fill/w_112,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Crich%20aerial%20graphic.jpg)
PLANNING SUBMISSION
DERBY
July 2021
​
Single storey wrap around extension and loft conversion at Crich Avenue house submitted for planning approval.
![Cabin base photo](https://static.wixstatic.com/media/d6406a_91028c6eac7645f6b3e7a3ac6b220a2a~mv2.jpeg/v1/fill/w_90,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/1156788C-B354-41B6-A86B-A2D0775EEDAC_1_105_c.jpeg)
GARDEN OFFICE
ANGLESEY
July 2021
​
Making a start on Llais Aderyn Cabin and what an evening to enjoy it.
![Hammerhill pool visualisation](https://static.wixstatic.com/media/d6406a_a46abb6cf03c49c5bf8483585afaea48~mv2.jpg/v1/fill/w_112,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/South%20side%20roof%20blur.jpg)
SUBMITTED FOR PLANNING
SHROPSHIRE
June 2021
​
A new swimming pool, attached to Hammerhill grand country house, overlooking the Clee & Welsh hills. The pool is clad in Corten-Steel, a material to compliment the existing sandstone house, that weathers over time and creates a beautiful patina.
![seintwar groundworks construction photo](https://static.wixstatic.com/media/d6406a_be142bcc89154cdcb25e99f0d628ecea~mv2.jpg/v1/fill/w_98,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/seintwar.jpg)
GROUNDWORKS
LLANFAES
June 2021
​
Blockwork at Seintwar set out to the timber soleplate design from Scotframe timber frame modular system.
![Fir Trees extension visualisation](https://static.wixstatic.com/media/d6406a_67d609a709fc426fa11f7fd4d107179a~mv2.jpg/v1/fill/w_112,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Fir%20Trees%20side%20front.jpg)
PLANNING APPROVED
PENTRAETH
June 2021
​
Single storey extension to Fir Trees house uses locally sourced larch cladding. We have created a new garden room and dining room, complete with space for a grand piano. We are now preparing drawings for Building Regulations.
![Stanton Beaumaris photo](https://static.wixstatic.com/media/d6406a_62b7124ccffd4f898e37eda2ca92c395~mv2.jpg/v1/fill/w_97,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/DJI_0249rearsea.jpg)
CLOSE TO COMPLETION
BEAUMARIS
May 2021
​
Extension and renovation at Stanton house, on the edge of the Menai Strait is almost complete. We are anticipating handover in July.
![swim above fun or essential](https://static.wixstatic.com/media/d6406a_5de89661127b46ebbc2fb123de578205~mv2.jpg/v1/fill/w_90,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/swim%20above%20fun%20or%20essential.jpg)
FUN or ESSENTIAL?
Rhosneigr
May 2021
​
Running a small business can be all consuming ... in both a great and challenging way. We started swimming on Friday after work because we love it. During lockdown we were unable to get out and we both noticed it was harder to switch off at the weekend and be present with family and friends. Now we realise it is both fun AND essential to our wellbeing. I wonder what strategies other people use ....
![Gorffwysfa extension visualisation](https://static.wixstatic.com/media/d6406a_407212d3c08146bb93f9e6072025096c~mv2.jpg/v1/fill/w_112,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Gorffwysfa%20web.jpg)
SUBMITTED FOR PLANNING
LLANDDONA
April 2021
​
Two storey extension to Gorffwysfa house, to maximise views over Llanddona beach.
![Ground works Seintwar photo](https://static.wixstatic.com/media/d6406a_ae686b97e7f543e69db253eeb04abbff~mv2.jpg/v1/fill/w_112,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Ground%20works%20May%2021.jpg)
GROUNDWORKS
LLANFAES
May 2021
​
Foundations going in at Seintwar in preparation for the delivery of Scotframe's timber frame modular system.
![Llanberis on a friday evening](https://static.wixstatic.com/media/d6406a_26da50448f954904a3b6552c956169c9~mv2.jpg/v1/fill/w_107,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Jump.jpg)
POST SITE VISIT DIP
LLANBERIS
April 2021
​
After the last site visit of the day, it would be rude not to make the most of the lake at Llanberis.
![Caer Wllf night visualisation](https://static.wixstatic.com/media/d6406a_e9e9803cb4ec4d5f93116ddbb9db5024~mv2.jpg/v1/fill/w_112,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Caer%20Wllf%20night.jpg)
SUBMITTED FOR PLANNING
![Min Y Mor birds-eye visualisation](https://static.wixstatic.com/media/d6406a_b8c7539941be489ab10ee16ea2a2a392~mv2.jpg/v1/fill/w_112,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Min%20Y%20Mor%20birds-eye.jpg)
SUBMITTED FOR PLANNING
MENAI BRIDGE
April 2021
​
Extension and renovation to a house located on the edge of the Menai Strait, Min Y Mor.
![Panton arms pub at night visualisation](https://static.wixstatic.com/media/d6406a_e49a99679a9d44129ac00d47f6f59b90~mv2.jpg/v1/fill/w_112,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Panton%20arms%20crowd%20night.jpg)
PLANNING APPROVAL
![Cabin sketch evergreen architects](https://static.wixstatic.com/media/d6406a_f201551409da43a5894cd222b8c6d57b~mv2.png/v1/fill/w_58,h_38,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/IMG_0976_PNG.png)
GARDEN OFFICE
ANGLESEY
March 2021
​
Sketch of Llais Aderyn Cabin, complete with living room, kitchenette, bathroom and sleeping quarters.
![Frondeg timber frame construction photo](https://static.wixstatic.com/media/d6406a_f1073542dff3469eb40ff0a5704df302~mv2.jpg/v1/fill/w_101,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Frondeg.jpg)
SITE VISIT
LLANBERIS
April 2021
​
Render board fixed over timber frame and slate roof completed at Frondeg Uchaf.
![Tan Y Esgair extension and renovation](https://static.wixstatic.com/media/d6406a_2a23e17af978476092c0d93bf608cf51~mv2.jpg/v1/fill/w_112,h_63,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Tan%20Y%20Esgair.jpg)
SUBMITTED FOR PLANNING
![Hammerhill pool sketch](https://static.wixstatic.com/media/d6406a_bba1a94fdd5e417d8b1a51f3e52efbde~mv2.jpg/v1/fill/w_105,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Hammer%20Hill%20sketch%20no%20text.jpg)
POOL HOUSE
SHROPSHIRE
March 2021
​
After a successful pre-app for this pool house in a greenbelt area in Shropshire, we are looking forward to developing our concept sketch into a full design with our client.
![Pentrans construction photo red wharf bay](https://static.wixstatic.com/media/d6406a_1488d8cbcada4926a50a0d0ef57dac6c~mv2.jpg/v1/fill/w_112,h_56,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Pentrans%20windows.jpg)
INTERNAL FIT-OUT
RED WHARF BAY
March 2021
​
Pentrans beach house windows are in - although currently boarded to protect them during building works. The internal fit-out is on the way.
![Wilbur dog evergreen architects](https://static.wixstatic.com/media/d6406a_d32b6041512848f38b3bff351cecbfc7~mv2.jpg/v1/fill/w_68,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/PXL_20210226_164023612.jpg)
SITE VISIT
RED WHARF BAY
March 2021
​
Wilbur joining us on a day of site visits, catching up on the progress of our projects. Lucky the last project is right on the beach!
![Penlon cabin Sketch evergreen architects](https://static.wixstatic.com/media/d6406a_b58405e7b7094946af0267b7d66e6b8b~mv2.png/v1/fill/w_58,h_38,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/Penlon%20cabin%20Sketch_PNG.png)
PLANNING APPROVAL
PENMON
February 2021
​
We just received planning approval for a cool little artist's cabin, along with renovations to the existing house at Penlon.
![Frondeg llanberis timber frame photo](https://static.wixstatic.com/media/d6406a_f8bea94e59784b48abecc3099b040a2f~mv2.jpg/v1/fill/w_99,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/CF1AE420-DE3E-4077-8684-776368A2E44E_JPG.jpg)
TIMBER FRAME CONSTRUCTION
LLANBERIS
March 2021
​
The timber frame is near completion at Frondeg Uchaf. Next the contractor will wrap insulation, OSB sheathing board and water proof membranes around the building.
![Varley extension visualisation](https://static.wixstatic.com/media/d6406a_90a1f006cdd947748095820ab04ca1ee~mv2.png/v1/fill/w_62,h_35,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/Varley%20extension.png)
PLANNING APPROVAL
MOSSLEY HILL
February 2021
​
Wrap-around single storey extension to a 1930s semi-detached house in Liverpool. Varley will be built with a beautiful handmade textured white brick.
![Cheese factory glulam interior photo](https://static.wixstatic.com/media/d6406a_47871a0df2b34640a40ee1ab849ed09f~mv2.jpg/v1/crop/x_0,y_14,w_768,h_465/fill/w_111,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Cheese%20factory%20int.jpg)
INTERIOR STRIPPED OUT
BETHESDA
January 2021
​
The interior has been stripped out, ready for refurbishment at Llanethdy Gwyn, The Cheese Factory.
![Cheese Factory extension Evergreen Architects Anglesey North Wales Architect Architecture](https://static.wixstatic.com/media/d6406a_53519610085a4052b7ef92b48ba1767a~mv2.jpg/v1/fill/w_68,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Cheese%20Factory.jpg)
CONSTRUCTION STARTED
![Hen Siop interior design sketch Evergreen Architects Anglesey North Wales Architect Architecture](https://static.wixstatic.com/media/d6406a_fc3ea572b04a48d8ab6cad0145233b5a~mv2.png/v1/fill/w_58,h_38,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/IMG_0814.png)
INTERIOR DESIGN
CAERHUN
January 2021
​
Sketch of staircase with integrated storage at Hen Shop.
![Seintwar visualisation](https://static.wixstatic.com/media/d6406a_6d16dcd18c944089a38d055bacf29b26~mv2.png/v1/fill/w_62,h_35,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/Image5.png)
BUILDING REGULATIONS
LLANFAES
January 2021
​
We're starting building regulation drawings for Seintwar new build house. The order for Scotframe timber frame modular system has been placed and we are expecting delivery in April.